After German Reunifaction a 380 kV power line interconnection between Krümmel Nuclear Power Station, in former West Germany, and the Görries substation in former East Germany was planned.
The plan was to replace the old coal-fired power station with a modern more powerful one. In Lübeck-Herrenwyk the former power plant, which was operated by a steelmill, a static inverter plant for a 450 kV DC powerline to Sweden was built.
Nearby
Name | Since | Distance | |||
---|---|---|---|---|---|
Niederegger Marzipan Museum | 2019 | 7.1km | site_ao | ||
Medieval Courtyards of Lübeck | 2016 | 6.8km | site_ao | ||
The Broken Bells of St. Mary’s | 2017 | 7.1km | site_ao | ||
The Broken Bells of St. Mary’s | 2017 | 7.1km | site_ao | ||
A Stunning, Two-Story Astronomical Clock in Lübeck | 2017 | 7.1km | site_ao | ||
Half Tower | 2017 | 7.2km | site_ao | ||
Danse Macabre Stained Glass | 2017 | 7.1km | site_ao | ||
The Devil’s Stone | 2017 | 7.1km | site_ao | ||
Hanseatic City of Lübeck | 1987 | 6.8km | site_whs |
About the source: Atlas Obscura
Atlas Obscura aims 'to inspire wonder and curiosity about the incredible world we all share'. You can contribute to their collection on their website.